Road of Remembrance
Date :10-03-2018
Location : Folkstone
History : http://www.subbrit.org.uk/db/1448307562.html
The structure appears to have been built at a later stage of the war, based on a message from the Vice Admiral at Dover in October 1942 describing arrangements made to build an underground structure containing a telephone exchange and a small control room. The estimated cost of the project was given as £1000 and the construction period three months.
No comments:
Post a Comment